Dam and Resevoir

Prompton Dam - Prompton State Park, Pennsylvania

Thalle Construction rebuilt the spillway around Prompton Dam, built a new concrete bridge over the spillway, added a new maintenance facility for the Corps of Engineers, and made numerous minor improvements to the roads in the park Read More

North Saluda Spillway - Greenville, South Carolina

Thalle rebuilt a 2000 foot concrete spillway that had degraded over time, and improved access roads into and out of the North Saluda Reservoir near Greenville, SC. Read More

Gilboa Dam - Gilboa, New York

Thalle worked with the NYCDEP on a preparatory project at Gilboa Dam, conducting large-scale site development, adding a construction bridge, building site access and haul roads, and grading staging areas for vehicles and equipment. Read More

Charles L. Turner Reservoir Dam - Siler City, North Carolina

In order to address Siler City’s continuing water supply needs, the city hired Thalle to construct a dam and create a 160 acre reservoir. Read More

Blalock Dam - Boiling Springs, South Carolina

Thalle rehabilitated Blalock Dam and Reservoir to provide additional storage of water for the City of Spartanburg. Read More

New Ragged Mountain Dam - Charlottesville, Virginia

New Ragged Mountain Dam Project is located in Albemarle County, Virginia approximately 4 miles west of the City of Charlottesville. The project includes construction of a new earthen dam along with an adjacent tunnel system and raw water pipeline that will serve as the principal spillway for the new dam structure. Read More

Herbert Hoover Dike Rehabilitation – C10 & C12 - Lake Okeechobee, Florida

For the Herbert Hoover Dike, Thalle Construction Company is rehabilitating the C10 and C12 culverts. This project involves the demolition of the existing culverts and the construction of the new water control structures S-273 and S-275. Read More

Herbert Hoover Dike Modification – 5 & 5A - Lake Okeechobee, Florida

The Herbert Hoover Dike is a 143-mile earthen dam that surrounds Lake Okeechobee, the heart of the Kissimmee-Okeechobee-Everglades system. The original dike was constructed with gravel, rock, limestone, sand, and shell. The project, replacing the existing dike culverts 5 and 5A, reduces impacts from flooding as a result of high lake levels for large area of south Florida. Read More

Kentucky Locks Addition - Grand Rivers, Kentucky

Thalle Construction is working with the US Army Corps of Engineers on a large, long-term project that will double the capacity of the locks that allow barge and boat traffic around the Kentucky Dam. Read More