CertainTeed Roxboro Plant

This project involved the excavation of 750,000 cubic yards of earth and 235,000 cubic yards of rock. Thalle brought its own mobile crusher to the site to crush the rock and use it for sub-base on the access roads which were also included in the scope of work. The project was completed on time and was incident and injury free.

Mass excavation, drilling and blasting, erosion control, site logistics and storm drain piping.