North Saluda Spillway
Thalle rebuilt a 2000 foot concrete spillway that had degraded over time, and improved access roads into and out of the North Saluda Reservoir near Greenville, SC.
Significant scope items included:
Demolition, surface preparation and restoration of specific areas, repair of joints in concrete slab and wall, repair of spillway small weeps, dewatering services, existing access road improvements, debris collection, removal from the project site, and disposal associated with the concrete demolition process.
The North Saluda Spillway project was completed in December of 2009.