White Oak Landfill - Waynesville, North Carolina
Thalle added a new cell to the existing White Oak landfill complex. Read More
Beaman Lake Embankment Rehabilitation - Raleigh, North Carolina
Thalle was contracted by the City of Raleigh to rehabilitate Beaman Lake. Read More
Central County Solid Waste Disposal Complex – Phase I - Sarasota, Florida
60-acre Class I Landfill Closure consisting of Earthwork, Geosynthetic liner, Gas extraction Wells and Piping, Storm Water Piping and Conveyance Systems, and Material Stockpiling. Read More
Lee County Ash Monofill & Compost Facility
Construction of a 20 acre expansion cell for the Ash Monofill and Construction of additional paving areas as well as the fabrication and installation of support buildings for the compost facility. Read More
Wateree Station – ISW Landfill Cells 1-5 - Wateree, South Carolina
The Wateree Station ISW Landfill Project is a 35-acre, new landfill construction for South Carolina Electric and Gas (SCE&G). The ISW Landfill was constructed onsite as part of a major “Scubber Modernization” project by SCE&G at its Wateree Station Facility. Read More
Cliffside Landfill - Cliffside, North Carolina
Thalle Construction built a fly ash landfill for the new coal-fired power plant at Cliffside Steam Station in North Carolina. Thalle was also contracted to expand the power plant's rail facilities and various other erosion control improvements in the area. Read More
Fresh Kills Landfill - Staten Island, New York
The Staten Island Landfill project is split into two phases. Phase 1 consists of capping the Muldoon Avenue Mound. Phase 2 consists of capping the other side of Muldoon along the Muldoon Avenue Corridor. Read More
Colbert Fossil Plant Ash Pond No. 4 Seismic Remediation Project - Tuscumbia, Alabama
This contract consists of remedial measures to the east dike of the Ash Pond No.4 at the Colbert Fossil Fuel Power Plant to reduce the potential for a release of coal ash to surface water during a seismic event. Read More
CDF Slurry Wall Landfill Phase 5 Sideslope Closure - Cocoa, Florida
The work is the closure of approximately 28 acres of the northeast, north and west side slopes of the Central Disposal Facility (CDF) Slurry Wall Landfill (SWL). Read More
CDF South Landfill Cell 1 - Cocoa, Florida
The work is the construction of the Central Disposal Facility (CDF) South Landfill Cell 1 that consists of approximately 41 acres. Read More