Reedy River Trunk Sewer System
Working for the Western Carolina Regional Sewer Authority, Thalle Construction installed 20,107 linear feet PVC lined concrete steel-end sewer pipe ranging from 48 to 96 inches in diameter and 20 to 45 feet in depth. The project also included 1,318 linear feet of tunnels, 827 linear feet of concrete encased river crossing, 35,000 cubic yards of rock excavation and 15,000 linear feet of small diameter connector sewer.
Traversing through the community of Greenville, construction was required within limited right of ways requiring specialized equipment and shoring systems. Thalle utilized both double and triple slide rail shoring systems to construct the project.